tgindex
KHAN IELTS
@khan_ieltssЯзыкианглийский

Aim for 8.5

Последний пост
21:04
Последнее чтение
19:10
Постов за неделю
6
Всего постов
48
Тип
открытый
Язык
английский
Категория
Языки
В каталоге с
13 авг.
Подписчики
262
−3 за 4 дн.
Сутки
−2
−0,76%
Неделя
 
Месяц
 
Просмотров на пост
428
40 постов
Вовлечённость
163,4%
к подписчикам
Постов в день
0,9
всего 48
Упоминаний
0
каналов
Охват размещения
оценка
1/24сутки в ленте
254
1/48двое суток
291
1/72трое суток
313

Оценка по просмотрам недавних постов: пост набирает почти всё за первые сутки.

Посты

  • без подписи

  • без подписи

  • 21:043071

    This is another one IDP-CDI

  • без подписи

  • без подписи

  • The breakdown of my latest results BC-CDI

  • 6 авг.214182

    Maybe next time. But, finally writing 8.

  • Meet our next heroine. She is one of the most hardworking students I have ever worked with. Next time, we will upgrade the score.

  • IELTS 7

  • Meet my youngest achiever. He is just 11 years old. But, he is one of the most talented students I have ever worked with. Nasib, we will improve this score soon!

  • без подписи

  • IELTS 7

  • Alhamdulillah! Next student’s results. IELTS 7

  • ⚡️ NEW BEGINNER ⚡️ ⏰ Time: 14:30 - 16:30 (Monday/Wednesday/Friday) 📆 Start date: July 27th (next Monday) ⏳ Duration: 3 months 👨‍🏫 IELTS Instructor: @xondamir_nishonboev (IELTS 8) 📚 The course covers basic grammar and helps improve Listening and Reading skills. 📍Location ‼️ MAX REPOST @khan_ieltss

  • 10 июл.3768из everest_multilevel

    😊😊😊😊😊😊 👤 Instructor: Xondamir Nishonboyev 💎 Instructor's personal result: IELTS 8.0 📖 Channel: @khan_ieltss Everest — home of real achievers! ☎️ 78-888-80-08

  • 10 июл.3306из everestofficial

    🔥 EVERESTER RESULTS — exam date May 17! IELTS: 7.0! Branch: we are one! Instructor: Mr. Xondamir Nishonboyev Instructorʼs personal result: 7.5! Channel: @khan_ieltss 🚀 Everest — home of real achievers! ☎️ 78-888-80-08

  • KHAN IELTS pinned a photo

  • 1 июл.452333

    Alhamdulillah! We’ll come back stronger soon…

  • The map illustrates how the Riverside Park has changed since 2010. Overall, the area has undergone significant modernization and become more visitor-friendly and entertaining, with the introduction of cafe, swings, hotel and cycle path. Notably, the main original features such as vegetation, heritage railway and parking facilities have been preserved. In 2010, the park had a relatively simple layout. To the east side, there was Heritage railway which run from south to north with stations in both sides, while south-west corner of the area was occupied by large vegetation. The main park area was encircled by road, which was accessed by the station of railway at the top. Inside this area, there were three parking spaces alongside the road as well as three toilet blocks near parking areas. Additionally, walking path curved through the eastern side of the park, making oval-shaped route near the center. To the northern boundaries, there was a river running from west to east. At present, the park has been considerably upgraded with several new facilities. A new cycle path has been constructed alongside the riverbank. Inside the park, new swings for children have been erected in northern side between toilets, while a new cafe now occupies the north side, close to oval-shaped road. A hotel also has been built in the south-eastern side, near the Heritage railway. More parking spaces have been added to the oval-shaped road to improve accessibility. Notably, some original features, including vegetation, railway and internal road system have largely been retained. #task1 @khan_ieltss

  • #realexamquestion